The original 31-storey building has been regenerated, adding 11 new storeys, 191 high-end luxury apartments, commercial offices and retail space.
Colt installed and supplied a ColtShaft ventilation system and car park smoke extraction to South Bank Tower, working closing with the consulting engineers during the design and development phase.
- Project:
- South Bank Tower
- Location:
- London
- Requirements:
- ColtShaft ventilation system and car park smoke extraction
- Main Contractor:
- Mace
- Consulting Engineer:
- Grontmij
- Specialist Contractor:
- Mace and Gardners Ductwork
- Colt products:
- ColtShaft
- Car park ventilation
- Seefire